Scope of works before price
A scope of works, a before-and-after image and a table of what changes in the room come first. The client signs up to the room, and the figures that follow are attached to something they can picture.
For renovation builders and refurbishment firms
ExtraflowDoc helps a renovation builder quote for a room the client cannot see yet: the scope of works, the before and after, selections and allowances that say what happens if the client chooses differently, a contingency on its own line, and a signature to get started.
Free plan available. No credit card required. Or build a quote in your browser with nothing to install.
See it in action
Explore the screenshots for a better understanding — click any screenshot to view it full-screen.
The ExtraflowDoc document editor
Built for renovation work
Renovation clients worry about two things: what the room will look like, and whether the price will creep up once the walls are opened up. A good estimate answers both before they have to ask.
A scope of works, a before-and-after image and a table of what changes in the room come first. The client signs up to the room, and the figures that follow are attached to something they can picture.
Mark vanity units, taps and lighting as allowances, and add a short table showing what happens if the client picks something cheaper or dearer. Variations stop turning into arguments.
Strip-out, plumbing and electrics, tiling, sanitaryware: each trade is a section with its own subtotal, so the client sees where the money goes and your subcontractors' prices stay traceable.
Put the contingency for hidden defects on its own line with the percentage in its name. Clients accept a contingency they were told about far more readily than a surprise variation.
Price the same room two or three ways in separate quotation tables, each with its own total. The client compares finishes and budgets without asking you to redo the estimate.
Add a payment schedule by stage and send the estimate for e-signature. When work starts, the accepted estimate becomes the first invoice in one click.
Worked example
This is a real ten-page ExtraflowDoc estimate from a renovation company in Charlotte to homeowners turning a tired family bathroom into a shower room with a level-access shower, a double vanity unit and underfloor heating, for $27,128.00. Renovation clients are buying a room they can only picture, and they worry that the bill will creep up, so this estimate tackles both.
A covering letter and a one-page summary lead into the scope of works. Then come a before-and-after page and a table of what changes in the bathroom, followed by the new layout and the selections the client has already made, so the price that comes next is tied to a picture.
Strip-out and preparation come to $5,250.00, plumbing and electrics to $5,466.00, tiling and the shower to $7,682.00. Sanitaryware and finishes, $6,260.00, are mostly allowances: the vanity unit, worktop, WC, shower valve and lighting each carry a budget rather than a model. A contingency of roughly 10%, $2,470.00, sits on its own line.
A three-row table shows what happens when the client chooses under, on or over an allowance: a $1,900 vanity unit against a $2,200 allowance is credited back, and a $1,100 shower set against a $650 allowance costs the difference at cost. The programme follows.
A payment schedule, the questions homeowners ask about living at home through the works, and a short page on what the estimate does and does not promise, finish with an acceptance block.
Renovation document examples
The full bathroom renovation estimate, a kitchen renovation estimate, a general job estimate and a decking estimate for outside the house. Click any example to open it.
Bathroom Remodel Estimate Example: Walk-in Shower
A shower room with a level-access shower: scope, before and after, five priced sections, allowances explained and a contingency.View full exampleCustomer stories
“Game changer for our construction business. Complex estimates that used to take hours now take 10 minutes.”
“Very intuitive. Our team was creating professional proposals on day one with zero training.”
“Best ROI of any software we've purchased. Paid for itself in the first week.”
Integrations
ExtraflowDoc installs into Pipedrive and monday.com, so the estimate is built on the deal or item the site visit created, with the address, the photos and the client's wish list already there.

Open ExtraflowDoc from the deal. The homeowner, the address and custom fields such as room, budget bracket or year built fill the estimate, and the signed PDF stays on the deal for the site manager.

If projects run on a monday.com board, build the estimate from the item. Its columns fill the document, and the signed estimate is saved back to the project.
Pricing
Designers, sales staff and the site managers who write up variations all share one plan. ExtraflowDoc charges by documents per month per company, not per user.
£0.00/month
5 documents/month per company
£11.80/month
20 documents/month per company
£19.68/month
35 documents/month per company
FAQ
Including what ExtraflowDoc does not do.
It is software that turns a site visit into an estimate a homeowner can sign: the scope of works, the trades priced by section, allowances, a contingency, a programme and payments. ExtraflowDoc does this inside Pipedrive or monday.com, from the deal or item the enquiry created.
No. ExtraflowDoc does not measure from plans, draw layouts or render rooms. Bring the quantities and the visuals from your own tools, and ExtraflowDoc puts them into an estimate with the prices, allowances and terms around them.
Name the line as an allowance, such as a vanity unit allowance, and add a short table explaining what happens under, on or over it. The example on this page does exactly that, so the client understands a change before it happens.
Yes. A variation is a short document of its own, built from the same deal and sent for e-signature, so the original estimate and every change sit together on the job.
No. There is no calendar for your gangs, no timesheets and no job costing against the budget. The estimate can carry a programme section for the homeowner; tracking the work happens in your project tool.
Yes. Enter subcontractor and material costs and add your mark-up or target margin on each line. The document details show your team cost, profit and margin for the whole job, and cost columns marked internal never reach the homeowner.
Yes. Add a quotation table for each option, each with its own total. Each table is fixed; the homeowner reads them side by side and tells you which one to build.
Yes. The free plan covers 5 documents a month with unlimited users, and paid plans start at £11.80/month for 20 documents, enough for a busy season of estimates and variations.
Ready for the next site visit?