About this example
This example is the proposal a mechanical contractor sends the facilities director of a three-floor 1987 office building in Pittsburgh: take out the R-22 chiller, the boiler and the perimeter fan coils, and put in a VRF heat-recovery system with a dedicated outdoor air unit, one floor at a time while the tenants stay in.
A commercial HVAC job is won on how little it disrupts the building as much as on price, so the proposal starts from what the survey found and the four conditions the owner set. It explains why heat recovery suits this building better than a new chiller, shows one floor's zones in plan, and gives a six-step schedule from permit to commissioning with the old plant running until each switchover. The scope says what is excluded, such as asbestos above the ceilings. A fixed price in three sections, five payments tied to the work, the manufacturer and labour warranties and the terms complete it.
Who it is for
Commercial HVAC and mechanical contractors that bid replacements and retrofits in occupied office, school and healthcare buildings.