Estimate example · Home remodeling

Home Renovation Estimate: Open Kitchen

A 7-page renovation estimate: load-bearing wall opened with a beam, new kitchen, vinyl plank floors, paint, a 7% contingency and selections.

Free plan available. No credit card required. See more document examples

At a glance

This example in numbers

About this example

This example is the estimate a remodeling contractor in Raleigh gives homeowners who want to open their townhouse kitchen to the living room and renew the whole main floor. It covers removing a load-bearing wall and setting an engineered beam, a new kitchen with an island and quartz tops, 780 square feet of vinyl plank flooring, drywall repair, paint and recessed lighting, permits and seven weeks of project management.

Renovation clients need to picture the result before they trust the number, so the estimate opens with the room today and after, and explains why the wall needs a beam and a permit. A summary gives the total, the area and how long the kitchen is out of use, followed by the three assumptions the price rests on and the scope. Costs run through four sections with a 7% contingency, sized for what an old wall can hide, then the selections still to make are budgeted as allowances, three alternates are priced on their own, and the schedule, terms and acceptance close it.

Who it is for

Remodeling contractors who estimate kitchen, main-floor and whole-home renovations for homeowners before a fixed-price contract.

Inside and how to use it

What this example contains, and how to make it yours

What's inside

  • The room today and after, and why the wall needs a beam
  • A summary with total, area, duration and assumptions
  • A scope of work with what stays with the homeowner
  • Costs in four sections, including a 7% contingency
  • Allowances for selections and three priced alternates
  • A seven-week schedule, terms and acceptance

How to adapt it

  • Show the room before and after on the first pages
  • Size the contingency to the risk of what walls can hide
  • List the selections still open as allowances with budgets
  • Say how long the kitchen will be out of use