Your reading of the job, before the number
Rich text sections carry the letter, the project as you understand it, what matters most to the owner and the risks you see. Naming the risks up front tells an owner you have already priced them.
For contractors & subcontractors
ExtraflowDoc is proposal software for contractors who win work on the plan as much as the price. Write the letter, your reading of the job, the phases, the team and comparable projects, then a lump sum by trade, the exclusions and the terms, and have the owner or the general contractor sign it online.
Free plan available. No credit card required. Or write a proposal in your browser with nothing to install.
See it in action
Explore the screenshots for a better understanding — click any screenshot to view it full-screen.
The ExtraflowDoc document editor
Built for how contractors win work
An owner or a general contractor choosing between bids is weighing risk as much as price. These are the six places a construction proposal shows it can be trusted with the job.
Rich text sections carry the letter, the project as you understand it, what matters most to the owner and the risks you see. Naming the risks up front tells an owner you have already priced them.
Lay out the phases with their tasks and inspections, then a table for deliveries, staging, crane lifts and working hours. The owner sees how the job will actually run on a live street, next to open businesses.
Photo galleries with captions show comparable projects with their size and duration, beside the people who would run this one. On a commercial bid, that page often decides who makes the shortlist.
Each trade or division gets its own pricing table and subtotal, with your fee and insurance on separate lines. A general contractor leveling bids, or an owner checking value, compares like with like.
Tables set out each allowance, each alternate as an add or a deduct, the unit prices for changes and everything you left out. When the scope moves later, the change has a line in the signed proposal to point at.
The owner or the GC signs with email verification and a timestamped audit trail. Save the proposal as a template and the next bid opens with your letter, phases, team and terms already in place.
Worked example
This is a real ten-page ExtraflowDoc proposal from a design-build contractor to a craft brewery: an 18-week taproom, kitchen and brewhouse build-out in Denver for a lump sum of $1,352,823.00. The price does not appear until page seven. On a commercial job the owner is choosing a contractor, so the proposal sells the plan, the team and the track record first.
Two people at the contractor sign a letter that names what makes this job unusual: a working brewhouse sharing a building with 280 seats and a kitchen. The next page restates the project, what matters most to the owner (opening by May 28, a wastewater permit passed first time, a budget fixed before demolition) and the three risks the contractor sees: a new 800 A service, the kitchen hood's lead time and trenching under an existing slab.
Five phases run from preconstruction to closeout, drains and electrical service first because everything else waits on them. A site logistics page sets delivery hours, staging in a leased rear lot and a one-Sunday crane lift, then lists three items on the critical path. The team page introduces the project executive, the preconstruction manager and the superintendent, followed by two breweries the contractor has built, with contract value and duration.
The price follows the permit set by trade: general requirements $162,300.00, demolition and structure $131,600.00, interiors $304,700.00, and mechanical, electrical and plumbing $659,840.00. The 6% fee and 1.5% insurance sit on separate lines, $94,383.00 together, so the owner sees the contractor's margin instead of hunting for it. No sales tax is added, because Colorado taxes the contractor on the materials it installs.
Allowances and qualifications state what the lump sum assumes, from a $12,000 signage allowance to a slab without post-tension cables, so a later change order can point at the line it changes. The exclusions follow, then progress billing against a schedule of values with 5% retainage, the AIA A101 the parties will sign, a one-year warranty and a two-party acceptance block.
Construction proposal examples
A general contractor's proposal to an owner, a subcontractor's bid to a general contractor and a mechanical replacement proposal. Click any example to open it page by page.
Construction Proposal Template: Commercial Build-Out
A design-build contractor's ten-page proposal for a brewery taproom build-out, priced as a lump sum by trade.View full exampleWatch the demo
A 4:41 walkthrough: one proposal, from the deal to the signature.
Customer stories
“Game changer for our construction business. Complex estimates that used to take hours now take 10 minutes.”
“Very intuitive. Our team was creating professional proposals on day one with zero training.”
“Best ROI of any software we've purchased. Paid for itself in the first week.”
Integrations
ExtraflowDoc installs into Pipedrive and monday.com and opens on the deal or board item, so the proposal starts from the invitation to bid, the client and the site you already logged.

Open ExtraflowDoc from the deal for the bid. The owner or GC, the site address and any field you map, such as the bid due date or gross area, fill the proposal, and the signed PDF stays on the deal.

If bids run on a monday.com board, build the proposal from the item. Its columns fill the document, and the signed proposal is stored back on the bid rather than in someone's inbox.
Pricing
Preconstruction, estimating and project management all work on one plan. ExtraflowDoc charges by documents per month per company, not by seat, so a busy bid season adds no licenses.
USD $0/month
5 documents/month per company
USD $14.99/month
20 documents/month per company
USD $24.99/month
35 documents/month per company
FAQ
Including what ExtraflowDoc does not do, so you know before you install it.
It is software for the document a contractor sends to win a job: the letter, the understanding of the project, the approach and phases, the team and past work, the price, the exclusions and the terms, with a way to accept it. ExtraflowDoc builds that document inside Pipedrive or monday.com, from the deal you track the bid in.
An estimate or a quote prices the work. A proposal argues that you are the right contractor to do it and puts the price inside that argument. ExtraflowDoc produces all three from the same editor; if you mostly need to price jobs, the construction estimating and quoting page is the better place to start.
A letter, your understanding of the project and its risks, the phases and schedule, site logistics when the site is tight, the team and comparable projects, the price by trade with your fee shown, allowances and qualifications, exclusions, payment terms and an acceptance block. The ten-page example on this page has every one of them, in that order.
Yes. The subcontractor bid on this page is one: a letter naming the bid package and documents, a table acknowledging every addendum, a base bid by building area with the bond on its own line, alternates, unit prices, inclusions and exclusions, a schedule and qualifications, signed by the chief estimator.
Yes. Keep the base bid in the pricing table and list each alternate in a table with its add or deduct amount, so it stays out of the base total. Unit prices for added or deleted work go in a second table that later change orders can refer to.
No. ExtraflowDoc does no takeoff: it will not open, scale or count from a drawing. Measure in your takeoff tool or spreadsheet, then bring the quantities and prices into the proposal.
No. ExtraflowDoc does not connect to bid boards or e-bidding portals, and it has no RFP answer library. It writes the proposal you send. When a portal asks for an upload, export the PDF and upload it there.
No. ExtraflowDoc does not generate AIA documents or G702/G703 pay applications. A proposal can name the contract form you will sign, as the example names an AIA A101, and once the job is won, progress invoices can be created from the same line items.
The signed proposal stays as it was. Price the change as a new document on the same deal, pointing at the allowance or qualification it changes, and have that signed too. There is no change-order workflow that edits a signed proposal; the record is the chain of signed documents.
Yes. Share a secure link or a PDF and request a signature. Signing uses email verification and records a timestamp and an audit trail, and the document's status moves from sent to viewed to signed.
Yes. Photo gallery blocks hold comparable projects and site photos with captions, on the same pages as the scope and the price, so the proof travels with the bid instead of in a separate brochure.
Yes. Save it as a template with the letter, phases, team, past projects and terms, and start the next bid from it. Only the project, its risks and the price need to be written fresh.
Not today. ExtraflowDoc's native integrations are Pipedrive and monday.com. It produces PDFs you can attach to a project in Procore or file in your accounting system, but it does not sync with either.
Yes. ExtraflowDoc's free plan covers 5 documents a month per company with unlimited users, which suits a small contractor sending a few bids a month. Paid plans start at USD $14.99/month for 20 documents, and because billing is per company, adding estimators does not raise the price.
Ready for the next bid?