About this example
This example is the proposal a building services contractor sends the facilities director of a three-storey 1987 office building in Pittsburgh: take out the R-22 chiller, the boiler and the perimeter fan coils, and put in a VRF heat-recovery system with a dedicated outdoor air unit, one floor at a time while the tenants stay in.
A commercial HVAC job is won on how little it disrupts the building as much as on price, so the proposal starts from what the survey found and the four conditions the owner set. It explains why heat recovery suits this building better than a new chiller, shows one floor's zones in plan, and gives a six-step programme from permit to commissioning with the old plant running until each switchover. The scope says what is excluded, such as asbestos above the ceilings. A fixed price in three sections, five stage payments, the manufacturer and labour warranties and the terms complete it.
Who it is for
Commercial HVAC and building services contractors that tender for replacements and retrofits in occupied offices, schools and healthcare buildings.